Phase V - GTA

Apr. 13, 2016

 - Extend Monorail between Brampton and Pearson Airport
 - Extend Monorail between Kingston Road (Highway #2) and Sheppard Avenue and Pickering/Ajax
 - New King Street LRT
 - Finch East LRT between between Relief Line at Don Mills and Finch and Malvern Centre
 - Extend Ellesmere LRT
 - Extend the Eglinton LRT to Erin Mills
 - Extend the Finch West-Highway #27 LRT to connect with the Waterfront LRT

Apr. 13, 2016

Phase V - Revised - Monorail or HERT, postponed Lawrence LRT, added Finch LRT
(15 to 20 Years)

Apr. 5, 2016

Phase V Option B for my Ten (10) Phase Rapid Transit Plan for Scarborough and Pickering/Ajax – This plan includes an LRT along Lawrence Avenue west of McCowan and Lawrence until ridership can be assured to justify a monorail (30 to 50 years down the road) - Ellesmere would be a future LRT – This all needs to be planned for now to ensure that adequate space is set aside for it

TO DO
- Postpone Lawrence Avenue LRT to Phase VI
- Add Finch East LRT