SmarterTracks - Relief Line
Apr. 12, 2017
I have abandoned the idea of merging the city's two proposals for the Leslieville portion of the Relief Line [Carlaw or Pape (as shown in green in the map below)] in favour of the Carlaw route - I was originally under the impression that the location of the station in the Pape proposal was a better fit for connecting with SmartTrack, but I have since learned that the city's preference is for a hub connecting with SmartTrack and surface transit at Carlaw and Gerrard
Apr. 12, 2017
Apr. 12, 2017
Apr. 12, 2017
Apr. 12, 2017
Mayor says work on the line can't start unless the province earmarks money for it
CBC News Posted: Apr 12, 2017 5:00 AM ET Last Updated: Apr 12, 2017 1:40 PM ET
Latest comments