Jul. 15, 2016

The latest version of Phase IV of my SmarterTracks plan for Scarborough includes the following:
- An LRT between Ellesmere GO and UTSC connecting with Scarborough Town Centre, Scarborough Centre, and Rouge Valley/Centenary Hospital
- An elevated rapid transit line [Monorail or HERT (High-capacity elevated rapid transit)] along Lawrence Avenue East and Kingston Road between Lawrence GO and Highway 2 at Sheppard and Kingston Road

Jul. 15, 2016

The latest version of Phase III of my SmarterTracks plan for Scarborough includes the following:
- A subway connecting Scarborough Centre and the Sheppard Subway at Don Mills and Sheppard
- Expansion of the parking facility at McCowan and Sheppard
- A busway along Sheppard Avenue between Scarborough Centre and Highway 2 at Sheppard and Kingston Road
- A Driverless Shuttlebus between the Toronto Zoo and the Sheppard Avenue BRT at Meadowvale and Sheppard

Jul. 14, 2016

The third draft of Phase II calls for a Markham Road LRT connecting Malvern Centre and Centennial College Progress Campus with Eglinton GO - It also includes a Driverless Shuttlebus connecting Centennial College, the Markham Road LRT, the McCowan Business Precinct, Scarborough Centre, Scarborough Town Centre, the Brimley Industrial Precinct, and Ellesmere GO

Jul. 14, 2016

I have completed the third draft of Phase I of my ten phase SmarterTracks for rapid transit in Scarborough - The third draft reinstates the proposed subway station at Danforth Road and Eglinton Avenue E. - Regardless of whether these stations are ever built or not, I believe they should be included and will show them regardless of what the city actually does end up doing

The 3rd draft also includes the proposed changes to the Crosstown East LRT to accomodate the proposed changes by the university at UTSC